Skip to main content

We've saved some files called cookies on your device. These cookies are:

  • essential for the site to work
  • to help improve our website by collecting and reporting information on how you use it

We would also like to save some cookies to help tailor communications.

BETA
You're viewing an updated version of this service - your feedback will help us to improve it.

Contract Notice

Ffordd Bleddyn

  • First published: 26 February 2025
  • Last modified: 26 February 2025
  • Record interest

     

  • This file may not be fully accessible.

  •  

Contents

Summary

OCID:
ocds-kuma6s-148527
Published by:
Transport for Wales
Authority ID:
AA50685
Publication date:
26 February 2025
Deadline date:
21 March 2025
Notice type:
Contract Notice
Has documents:
Yes
Has SPD:
No
Has Carbon Reduction Plan:
No

Abstract

This Scope relates to the completion of outstanding scope of the construction of a new overbridge at Ffordd Bleddyn. In addition to the bridge, the recently completed construction works included highway realignment and utility diversions. Works Completed by Others, include but are not limited to the following, and are to be verified by the Contractor; • Cabling/Switchover Works, o Cabling and electrical switchover works as part of the traffic management (TM) phase 1, • BT Chamber Removal and backfill, • Southeast (SE) Corner Civil Works, o The reinforced concrete (RC) base for the a Vehicle Restraint System (VRS) was installed, o Signage, the RC foundation for Column 2N, signal sockets, edgings, tactile paving, and VRS were installed, o Construction of Taff Trail footpath corner, • Column Installation, o Column 2N was erected at the designated location and all necessary connections were made, o The electrical connection was completed between Column 2N and Column 1N, • Site Clean-Up and Boundary Installation, o The boundary fence was installed along the VRS/guardrails, securing the area, • Road Reopening, o The road was reopened to traffic under temporary traffic light control and pedestrian crossings. • Any other completed works completed by Others. The works to be completed, include but are not limited to the following, and are to be verified by the Contractor; • Cardiff Road drainage works, • Cardiff Road Civils work - install traffic signal NALs, chamber, ducting, height extension to existing steel parapet to cycleway, • Cardiff Road Civils work – Street Light ducting, chamber, and column 1N RC foundation. Kerbs, Edgings, Tactiles, Signs, Ped Guardrails, tarmac to binder level etc., • Install traffic signal poles, lights, push buttons, and cabling, • Maintain existing temporary TM arrangements until permanent TM has been installed and commissioned, • Remove TM and re-open road fully to the public under the new permanent traffic light system, • Palisade fencing works along the track and top of the wingwall, • Knotweed removal by hand, • Install key clamp up the wingwall and waterproofing, • Install boundary fence on the batter and finish topsoil around this area, • Profile planing required on Cardiff Road and footpaths. • Install plug joints, install tarmac on Cardiff Road, • install ped guardrail to close off south footpath, surface south footpath, and finish road markings, • any other incomplete works required by this Contract.

Full notice text

CONTRACT NOTICE – NATIONAL

WORKS

1 Authority Details

1.1

Authority Name and Address


Transport for Wales

3 Llys Cadwyn, Taff Street,

Pontypridd

CF37 4TH

UK

Chris Perry

+44 2921673434



https://www.sell2wales.gov.wales
https://www.sell2wales.gov.wales

1.2

Address from which documentation may be obtained


Transport for Wales

3 Llys Cadwyn, Taff Street,

Pontypridd

CF37 4TH

UK


+44 2921673434


1.3

Completed documents must be returned to:


Transport for Wales

3 Llys Cadwyn, Taff Street,

Pontypridd

CF37 4TH

UK


+44 2921673434


2 Contract Details

2.1

Title

Ffordd Bleddyn

2.2

Description of the goods or services required

This Scope relates to the completion of outstanding scope of the construction of a new overbridge at Ffordd Bleddyn. In addition to the bridge, the recently completed construction works included highway realignment and utility diversions.

Works Completed by Others, include but are not limited to the following, and are to be verified by the Contractor;

• Cabling/Switchover Works,

o Cabling and electrical switchover works as part of the traffic management (TM) phase 1,

• BT Chamber Removal and backfill,

• Southeast (SE) Corner Civil Works,

o The reinforced concrete (RC) base for the a Vehicle Restraint System (VRS) was installed,

o Signage, the RC foundation for Column 2N, signal sockets, edgings, tactile paving, and VRS were installed,

o Construction of Taff Trail footpath corner,

• Column Installation,

o Column 2N was erected at the designated location and all necessary connections were made,

o The electrical connection was completed between Column 2N and Column 1N,

• Site Clean-Up and Boundary Installation,

o The boundary fence was installed along the VRS/guardrails, securing the area,

• Road Reopening,

o The road was reopened to traffic under temporary traffic light control and pedestrian crossings.

• Any other completed works completed by Others.

The works to be completed, include but are not limited to the following, and are to be verified by the Contractor;

• Cardiff Road drainage works,

• Cardiff Road Civils work - install traffic signal NALs, chamber, ducting, height extension to existing steel parapet to cycleway,

• Cardiff Road Civils work – Street Light ducting, chamber, and column 1N RC foundation. Kerbs, Edgings, Tactiles, Signs, Ped Guardrails, tarmac to binder level etc.,

• Install traffic signal poles, lights, push buttons, and cabling,

• Maintain existing temporary TM arrangements until permanent TM has been installed and commissioned,

• Remove TM and re-open road fully to the public under the new permanent traffic light system,

• Palisade fencing works along the track and top of the wingwall,

• Knotweed removal by hand,

• Install key clamp up the wingwall and waterproofing,

• Install boundary fence on the batter and finish topsoil around this area,

• Profile planing required on Cardiff Road and footpaths.

• Install plug joints, install tarmac on Cardiff Road,

• install ped guardrail to close off south footpath, surface south footpath, and finish road markings,

• any other incomplete works required by this Contract.

NOTE: To register your interest in this notice and obtain any additional information please visit the Sell2Wales Web Site at https://www.sell2wales.gov.wales/Search/Search_Switch.aspx?ID=148527.

The buyer has indicated that it will accept electronic responses to this notice via the Postbox facility. A user guide is available at https://www.sell2wales.gov.wales/sitehelp/help_guides.aspx.

Suppliers are advised to allow adequate time for uploading documents and to dispatch the electronic response well in advance of the closing time to avoid any last minute problems.

2.3

Notice Coding and Classification

31518000 Signalling lights
34942000 Signalling equipment
34990000 Control, safety, signalling and light equipment
44115100 Ducting
44212100 Bridge
45111240 Ground-drainage work
45213321 Railway station construction work
45221100 Construction work for bridges
45221110 Bridge construction work
45221112 Railway bridge construction work
45221113 Footbridge construction work
45232450 Drainage construction works
45232452 Drainage works
45233000 Construction, foundation and surface works for highways, roads
45233130 Construction work for highways
45233294 Installation of road signals
45234100 Railway construction works
45234116 Track construction works
45262210 Foundation work
45316200 Installation of signalling equipment
45340000 Fencing, railing and safety equipment installation work
50232200 Traffic-signal maintenance services
100 UK - All
1000 WALES
1010 West Wales and The Valleys
1011 Isle of Anglesey
1012 Gwynedd
1013 Conwy and Denbighshire
1014 South West Wales (Carmarthenshire, Pembrokeshire, Ceredigion)
1015 Central Valleys (Merthyr Tydfil, Rhondda Cynon Taf)
1016 Gwent Valleys (Torfaen, Blaenau Gwent, Caerphilly)
1017 Bridgend and Neath Port Talbot
1018 Swansea
1020 East Wales
1021 Monmouthshire and Newport
1022 Cardiff and Vale of Glamorgan
1023 Flintshire and Wrexham
1024 Powys

2.4

Total quantity or scope of tender

3 Conditions for Participation

3.1

Minimum standards and qualification required

4 Administrative Information

4.1

Type of Procedure

Single stage

4.2

Reference number attributed to the notice by the contracting authority

N/a

4.3

Time Limits

Time-limit for receipt of completed tenders
    21-03-2025  Time  12:00

Estimated award date
 04-04-2025

4.5

Language or languages in which tenders or requests to participate can be drawn up

EN 

4.6

Tender Submission Postbox

The buyer has indicated that it will accept electronic responses to this notice via the Postbox facility. A user guide is available at https://www.sell2wales.gov.wales/sitehelp/help_guides.aspx

5 Other Information

5.1

Additional Information

Further site information will be uploaded week commencing 3rd March 2025.

(WA Ref:148527)

The buyer considers that this contract is suitable for consortia bidding.

5.2

Additional Documentation

Ffordd Bleddyn Tender Docs

5.3

Publication date of this notice

 26-02-2025

Coding

Commodity categories

ID Title Parent category
44212100 Bridge Structural products and parts except prefabricated buildings
45221110 Bridge construction work Construction work for bridges and tunnels, shafts and subways
45221100 Construction work for bridges Construction work for bridges and tunnels, shafts and subways
45233130 Construction work for highways Construction, foundation and surface works for highways, roads
45233000 Construction, foundation and surface works for highways, roads Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork
34990000 Control, safety, signalling and light equipment Miscellaneous transport equipment and spare parts
45232450 Drainage construction works Ancillary works for pipelines and cables
45232452 Drainage works Ancillary works for pipelines and cables
44115100 Ducting Building fittings
45340000 Fencing, railing and safety equipment installation work Building installation work
45221113 Footbridge construction work Construction work for bridges and tunnels, shafts and subways
45262210 Foundation work Special trade construction works other than roof works
45111240 Ground-drainage work Demolition, site preparation and clearance work
45233294 Installation of road signals Construction, foundation and surface works for highways, roads
45316200 Installation of signalling equipment Installation work of illumination and signalling systems
45221112 Railway bridge construction work Construction work for bridges and tunnels, shafts and subways
45234100 Railway construction works Construction work for railways and cable transport systems
45213321 Railway station construction work Construction work for commercial buildings, warehouses and industrial buildings, buildings relating to transport
34942000 Signalling equipment Railway equipment
31518000 Signalling lights Electric filament lamps
45234116 Track construction works Construction work for railways and cable transport systems
50232200 Traffic-signal maintenance services Maintenance services of public-lighting installations and traffic lights

Delivery locations

ID Description
1017 Bridgend and Neath Port Talbot
1022 Cardiff and Vale of Glamorgan
1015 Central Valleys (Merthyr Tydfil, Rhondda Cynon Taf)
1013 Conwy and Denbighshire
1020 East Wales
1023 Flintshire and Wrexham
1016 Gwent Valleys (Torfaen, Blaenau Gwent, Caerphilly)
1012 Gwynedd
1011 Isle of Anglesey
1021 Monmouthshire and Newport
1024 Powys
1014 South West Wales (Carmarthenshire, Pembrokeshire, Ceredigion)
1018 Swansea
100 UK - All
1000 WALES
1010 West Wales and The Valleys

Alert region restrictions

The buyer has restricted the alert for this notice to suppliers based in the following regions.

ID Description
There are no alert restrictions for this notice.

About the buyer

Main contact:
N/a
Admin contact:
N/a
Technical contact:
N/a
Other contact:
N/a

Further information

Date Details
No further information has been uploaded.

Postbox

The awarding buyer has indicated that it will accept electronic responses to this notice via the Tender Submission Postbox facility.

Submit your tender response electronically in a secure environment.

To create an electronic response please click the "Add to my interest list" button at the top of the page.

For more information on the Postbox Facility please refer to the user guide:

Q&A

Ask the buyer any questions you may have relating to this notice. To ask the buyer a question or questions please click the "View Questions and Answers" button.

Additional Documents

The following additional documents have been attached to this notice. To obtain these documents please select the individual file names below.

Current documents

There are no documents attached to this document

Replaced documents

There are no previous versions of these documents.


0800 222 9004

Lines are open 8:30am to 5pm Monday to Friday.

Rydym yn croesawu galwadau'n Gymraeg.

We welcome calls in Welsh.