Skip to main content

We've saved some files called cookies on your device. These cookies are:

  • essential for the site to work
  • to help improve our website by collecting and reporting information on how you use it

We would also like to save some cookies to help tailor communications.

BETA
You're viewing an updated version of this service - your feedback will help us to improve it.

Contract Notice

NCC202402120 - Mon and Brecon Canal Desilting Operations

  • First published: 28 June 2024
  • Last modified: 28 June 2024

The buyer is not using this website to administer the notice.

To record your interest or obtain additional information or documents please find instructions within the Full Notice Text. (NOTE: Contract Award Notices and Prior Information Notices do not normally require a response)

Contents

Summary

OCID:
ocds-kuma6s-142576
Published by:
Newport City Council
Authority ID:
AA0273
Publication date:
28 June 2024
Deadline date:
19 July 2024
Notice type:
Contract Notice
Has documents:
No
Has SPD:
No
Has Carbon Reduction Plan:
Yes

Abstract

Monmounthshire and Brecon Canal- To fully desilt the canal bed between Caerphilly boundary at Harry Roberts Bridge and Pontymason Lane. This will Involve draining down this section and overpumping the water downstream into the section of canal between Pontymason Lane and 14 Locks Visitor Centre. Once dry, the silt which is estimated to be approx. 1000 to 1200 m3 will be taken off site to a location within the Newport Boundary (Shaftesbury Park for stockpiling) within a boarded construction site style compound located at the end of the park outside the former Shaftesbury allotment. This compound will be erected by the contractor winning the tender. On receiving the silt from the canal at the compound the contractor will shape the silt in order to maximise storage and ensure run of water from the material. The sections from Pontymason Lane downstream to 14 Locks Visitor Centre will have excess silt removed around structures (bridges) and pinch points through visual inspection and by consulting the geological surveys which will be made available to you. The material to remove here is estimated to be between 200 to 300 m3. Works will take place under a watching brief carried out by an ecologist. Fish and amphibians from the drained sections will be relocated downstream. Works are anticipated to be completed within 4-5 weeks.

Full notice text

CONTRACT NOTICE – NATIONAL

WORKS

1 Authority Details

1.1

Authority Name and Address


Newport City Coucil

Newport Civic Centre, Godfrey Road,

Newport

NP204UR

UK

Michael Owen

+44 1633987787

michael.owen@newport.gov.uk

https://www.newport.gov.uk
https://etenderwales.bravosolution.co.uk/home.html
https://etenderwales.bravosolution.co.uk/home.html

1.2

Address from which documentation may be obtained

As in 1.1

1.3

Completed documents must be returned to:

As in 1.1

2 Contract Details

2.1

Title

NCC202402120 - Mon and Brecon Canal Desilting Operations

2.2

Description of the goods or services required

Monmounthshire and Brecon Canal- To fully desilt the canal bed between Caerphilly boundary at Harry Roberts Bridge and Pontymason Lane. This will Involve draining down this section and overpumping the water downstream into the section of canal between Pontymason Lane and 14 Locks Visitor Centre. Once dry, the silt which is estimated to be approx. 1000 to 1200 m3 will be taken off site to a location within the Newport Boundary (Shaftesbury Park for stockpiling) within a boarded construction site style compound located at the end of the park outside the former Shaftesbury allotment. This compound will be erected by the contractor winning the tender. On receiving the silt from the canal at the compound the contractor will shape the silt in order to maximise storage and ensure run of water from the material. The sections from Pontymason Lane downstream to 14 Locks Visitor Centre will have excess silt removed around structures (bridges) and pinch points through visual inspection and by consulting the geological surveys which will be made available to you. The material to remove here is estimated to be between 200 to 300 m3. Works will take place under a watching brief carried out by an ecologist. Fish and amphibians from the drained sections will be relocated downstream. Works are anticipated to be completed within 4-5 weeks.

NOTE: The authority is using eTenderwales to carry out this procurement process. To obtain further information record your interest on Sell2Wales at https://www.sell2wales.gov.wales/search/search_switch.aspx?ID=142576

2.3

Notice Coding and Classification

45247000 Construction work for dams, canals, irrigation channels and aqueducts
45247110 Canal construction
45247112 Drainage canal construction work
45248100 Canal locks construction work
1021 Monmouthshire and Newport

2.4

Total quantity or scope of tender

Monmounthshire and Brecon Canal- To fully desilt the canal bed between Caerphilly boundary at Harry Roberts Bridge and Pontymason Lane. This will Involve draining down this section and overpumping the water downstream into the section of canal between Pontymason Lane and 14 Locks Visitor Centre. Once dry, the silt which is estimated to be approx. 1000 to 1200 m3 will be taken off site to a location within the Newport Boundary (Shaftesbury Park for stockpiling) within a boarded construction site style compound located at the end of the park outside the former Shaftesbury allotment. This compound will be erected by the contractor winning the tender. On receiving the silt from the canal at the compound the contractor will shape the silt in order to maximise storage and ensure run of water from the material. The sections from Pontymason Lane downstream to 14 Locks Visitor Centre will have excess silt removed around structures (bridges) and pinch points through visual inspection and by consulting the geological surveys which will be made available to you. The material to remove here is estimated to be between 200 to 300 m3. Works will take place under a watching brief carried out by an ecologist. Fish and amphibians from the drained sections will be relocated downstream. Works are anticipated to be completed within 4-5 weeks.

Please refer to ITT Volume 2 within e-Tender Wales for further information relating to the tender.

3 Conditions for Participation

3.1

Minimum standards and qualification required

Please refer to the qualification envelope within e-Tender Wales.

4 Administrative Information

4.1

Type of Procedure

Single stage

4.2

Reference number attributed to the notice by the contracting authority

NCC202402120

4.3

Time Limits

Time-limit for receipt of completed tenders
    19-07-2024  Time  12:00

Estimated award date
 12-08-2024

4.5

Language or languages in which tenders or requests to participate can be drawn up

EN 

4.6

Tender Submission Postbox

5 Other Information

5.1

Additional Information

(WA Ref:142576)

5.2

Additional Documentation

5.3

Publication date of this notice

 28-06-2024

Coding

Commodity categories

ID Title Parent category
45247110 Canal construction Construction work for dams, canals, irrigation channels and aqueducts
45248100 Canal locks construction work Construction work for hydro-mechanical structures
45247000 Construction work for dams, canals, irrigation channels and aqueducts Construction work for water projects
45247112 Drainage canal construction work Construction work for dams, canals, irrigation channels and aqueducts

Delivery locations

ID Description
1021 Monmouthshire and Newport

Alert region restrictions

The buyer has restricted the alert for this notice to suppliers based in the following regions.

ID Description
There are no alert restrictions for this notice.

About the buyer

Main contact:
michael.owen@newport.gov.uk
Admin contact:
N/a
Technical contact:
N/a
Other contact:
N/a

Further information

Date Details
No further information has been uploaded.

0800 222 9004

Lines are open 8:30am to 5pm Monday to Friday.

Rydym yn croesawu galwadau'n Gymraeg.

We welcome calls in Welsh.