Total quantity or scope of tender
Project Budget: £300,000
Scope of Work:
RIBA Stage 3 – Developed Design
• Finalisation of design incorporating planning conditions and stakeholder feedback
• Coordination with structural, M&E, and other specialist consultants
• Preparation of detailed cost estimates and value engineering
• Submission of updated planning applications (if required)
RIBA Stage 4 – Technical Design
• Development of full construction drawings and specifications
• Coordination of statutory approvals (Building Regulations, Fire Strategy, etc.)
• Production of tender documentation for contractor selection
RIBA Stage 5 – Construction
• Contract administration and site inspections
• Design queries resolution and variations management
• Quality control and compliance with specifications
RIBA Stage 6 – Handover and Close-Out
• Commissioning and snagging resolution
• Handover of O&M manuals and as-built drawings
• Training for centre management on new systems
RIBA Stage 7 – In Use
• Post-occupancy evaluation
• Rectification of defects during the defects liability period
• Performance monitoring and sustainability assessment
|