II.2.2) Additional CPV code(s)
60210000
II.2.3) Place of performance
NUTS code:
UKG33
Main site or place of performance:
Coventry
II.2.4) Description of the procurement
The Council are developing the innovative CVLR project. This seeks to introduce a low-cost
urban light rail system into the heart of Coventry.
The primary objective of the Coventry Very Light Rail Project is to create an affordable integrated transport system that comprises a lightweight low-cost vehicle and innovative
trackform. The low cost means it can be implemented at scale, thereby driving significant
mode shift to a low carbon mode, with an ambition to achieve zero carbon ultimately by using renewable energy to power the system.
A full CVLR network is envisaged in the future but to allow this to be managed in a safe and
effective manner, the first stage will be a CVLR Live Environment Construction Testing
(LECT) route.
CVLR LECT will be operational for a four (4) week period from Monday 19 May 2025 through Sunday 15 June 2025. The vehicle will be transferred to Coventry on Monday 19 May 2025.
The awarded Operator will be required to perform some pre-work such as creation of Safety
Management System ("SMS") and driver training.
A vehicle operator is required to operate the CVLR vehicle through the period outlined
above. A concept of operations (ConOps) has been developed and outlines how Coventry
Very Light Rail (CVLR) Live Test Environment Construction Testing (LECT) is expected to be
operated under normal, degraded and emergency scenarios.
The Council published a Prior Information Notice (reference 2024/S 000-040263) on 13 December 2024, utilising Regulation 27(4) of the Public Contracts Regulations 2015 (as
amended) to reduce the tender period to 15 days.
Coventry City Council conducts all of its tendering exercises on its e-procurement portal,
www.csw-jets.co.uk. Interested Operators should register with www.csw-jets.co.uk to access the tender documentation
II.2.5) Award criteria
Price is not the only award criterion and all criteria are stated only in the procurement documents
II.2.7) Duration of the contract, framework agreement or dynamic purchasing system
Duration in months: 4
This contract is subject to renewal: No
II.2.9) Information about the limits on the number of candidates to be invited
II.2.10) Information about variants
Variants will be accepted:
No
II.2.11) Information about options
Options:
No
II.2.13) Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
No
II.2.14) Additional information
The Council published a Prior Information Notice (reference 2024/S 000-040263) on 13 December 2024, utilising Regulation 27(4) of the Public Contracts Regulations 2015 (as
amended) to reduce the tender period to 15 days.