Hartlepool Borough council is seeking to appoint a lead consultant backed by a multi-disciplinary team to develop a full design programme for a leisure centre facility with swimming pools.
This commission will include an initial design up to and including RIBA 4, with a break clause in place should the project not proceed. Assuming the scheme progresses the consultancy team will then be required to supervise the pre-construction, construction and handover processes incorporating RIBA 5 to 6 (inclusive).
The lead designer will be expected to provide the full range of building services including, but not limited to the following:
• Lead consultant for the building element including the role of Principal Designer
• Architectural design
• Structural engineering for the pool and building
• Civil engineering (for building drainage, etc.)
• Mechanical and electrical engineers
• Specialist swimming pool related consultants
• Access Consultant
• Acoustician
• Fire Safety Consultant.
The external works elements will be undertaken in-house by HBC (landscape architecture and civil engineering).
This tender will be a 2 Stage Process under the Public Contract Regulation 2015 Restricted Procedure. Full details of the tender process and evaluation are provided in the tender documents.
Interested Organisation wishing to register an interest and download the tender documents, should apply via the ProContract e-tendering portal
https://procontract.due-north.com
All completed documentation for the first stage of this tender process must be uploaded via the ProContract e-tendering portal Only and submitted no later than 14:00 hours on Friday 31 July 2020.
Late submissions will not be accepted. (Postal and e-mail submissions will also not be accepted.)
II.2.5) Award criteria
Quality criterion: Quality Questions in the Tender Documentation
/ Weighting: 60 %
Price
/ Weighting:
40 %
II.2.11) Information about options
Options:
Yes
Description of options:
This commission will include an initial design up to and including RIBA 4, with a break clause in place should the project not proceed.
Assuming the scheme progresses the consultancy team will then be required to supervise the pre-construction, construction and handover processes incorporating RIBA 5 to 6 (inclusive).
II.2.13) Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds: