Contract Notice

NWRT - Nant Garred Ddu Rocky Ramp NGarrDdu-Rramp-0001

  • First published: 11 July 2024
  • Last modified: 11 July 2024

Contents

Summary

OCID:
ocds-kuma6s-142951
Published by:
North Wales River Trust
Authority ID:
AA83577
Publication date:
11 July 2024
Deadline date:
26 July 2024
Notice type:
Contract Notice
Has documents:
Yes
Has SPD:
No
Has Carbon Reduction Plan:
No

Abstract

Please contact the above email/telephone number to arrange a site visit or visit this open site yourself and contact us with any questions. Reinstate a rocky ramp/stepped pool that was previously installed. Please consult the above drawings. Scour pool infill: The scour pool immediately below the weir is too deep (1-1.5m depth depending on flow) to install all of the rocky ramp/stepped pool. This will require filling in partially (50%) with gravel/pebble material (0.05-0.25m sizes; ~12.5m3). The pool is approx. 5 x 5 m and is sloped into the centre of the pool. Once filled, this will need to be topped with a geotextile membrane which will be secured in place. The newly implemented rocky ramp/stepped pool will sit on top of this section. Gravel, pebble and cobble should be placed on top to form a new base layer. Rocky ramp: Large 0.5-3 tonne boulders will be required for the works (please provide an estimation of the amount required upon quoting, we estimate requiring 5-8 large boulders per “step”) as they need to be large enough to not move during high flow. Over a 25m distance from the weir working downstream, arrange boulders in a downstream facing arc at 5 metre intervals (see drawings above). One or a few of the boulders in each arc should be lower (into substrate) to allow water to chute over the top and provide an entry point for fish into the pool. The head difference (height of the water) between the lowest boulder(s) in each arc to be no more than 0.3m to the next consecutive pool up- or downstream. Boulders should be keyed into the bank and substrate where possible to increase stability and 12.5mm rebar can be used if needed to connect boulders. Boulders may be required around the edge of the scour pool downstream of the weir. Once boulders have been placed into the channel, gaps should be infilled with 0.05-0.25m gravel/pebbles to secure the boulders in place. Channel width is approx 5-6m over the 25m length. Normally the ramp is constructed in a downstream to upstream direction. Care must be taken to secure the downstream end of the ramp to prevent the toe from being removed in high flows. ‘Flow control’ rocks must also be used between the slots in each step (see image). Water diversion: The utilisation of a coffer dam (or similar) may be required to divert flow from each bank (to one half of the channel width) at a time in order to carry out the works on each side in a dry area. PLEASE consult the attached document for more details.

Full notice text

CONTRACT NOTICE – NATIONAL

SUPPLIES

1 Authority Details

1.1

Authority Name and Address


North Wales River Trust

Gwel Yr Afon, Llanddoged,,

Llanrwst

LL26 0TY

UK

Liam Whitmore

+44 7301018822


http://www.northwalesriverstrust.org
https://www.sell2wales.gov.wales

1.2

Address from which documentation may be obtained


North Wales River Trust

Gwel Yr Afon, Llanddoged,,

Llanrwst

LL26 0TY

UK

Liam Whitmore

+44 7539128466

liam@northwalesriverstrust.org

http://www.northwalesriverstrust.org

1.3

Completed documents must be returned to:


North Wales River Trust

Gwel Yr Afon, Llanddoged,,

Llanrwst

LL26 0TY

UK

Liam Whitmore

+44 7301018822

liam@northwalesriverstrust.org

http://www.northwalesriverstrust.org

2 Contract Details

2.1

Title

NWRT - Nant Garred Ddu Rocky Ramp NGarrDdu-Rramp-0001

2.2

Description of the goods or services required

Please contact the above email/telephone number to arrange a site visit or visit this open site yourself and contact us with any questions.

Reinstate a rocky ramp/stepped pool that was previously installed. Please consult the above drawings.

Scour pool infill:

The scour pool immediately below the weir is too deep (1-1.5m depth depending on flow) to install all of the rocky ramp/stepped pool. This will require filling in partially (50%) with gravel/pebble material (0.05-0.25m sizes; ~12.5m3). The pool is approx. 5 x 5 m and is sloped into the centre of the pool. Once filled, this will need to be topped with a geotextile membrane which will be secured in place. The newly implemented rocky ramp/stepped pool will sit on top of this section. Gravel, pebble and cobble should be placed on top to form a new base layer.

Rocky ramp:

Large 0.5-3 tonne boulders will be required for the works (please provide an estimation of the amount required upon quoting, we estimate requiring 5-8 large boulders per “step”) as they need to be large enough to not move during high flow. Over a 25m distance from the weir working downstream, arrange boulders in a downstream facing arc at 5 metre intervals (see drawings above). One or a few of the boulders in each arc should be lower (into substrate) to allow water to chute over the top and provide an entry point for fish into the pool. The head difference (height of the water) between the lowest boulder(s) in each arc to be no more than 0.3m to the next consecutive pool up- or downstream. Boulders should be keyed into the bank and substrate where possible to increase stability and 12.5mm rebar can be used if needed to connect boulders. Boulders may be required around the edge of the scour pool downstream of the weir. Once boulders have been placed into the channel, gaps should be infilled with 0.05-0.25m gravel/pebbles to secure the boulders in place. Channel width is approx 5-6m over the 25m length. Normally the ramp is constructed in a downstream to upstream direction. Care must be taken to secure the downstream end of the ramp to prevent the toe from being removed in high flows. ‘Flow control’ rocks must also be used between the slots in each step (see image).

Water diversion:

The utilisation of a coffer dam (or similar) may be required to divert flow from each bank (to one half of the channel width) at a time in order to carry out the works on each side in a dry area.

PLEASE consult the attached document for more details.

NOTE: To register your interest in this notice and obtain any additional information please visit the Sell2Wales Web Site at https://www.sell2wales.gov.wales/Search/Search_Switch.aspx?ID=142951.

2.3

Notice Coding and Classification

90700000 Environmental services
1013 Conwy and Denbighshire

2.4

Total quantity or scope of tender

3 Conditions for Participation

3.1

Minimum standards and qualification required

Work must be completed by no later than 06/09/24

4 Administrative Information

4.1

Type of Procedure

Single stage

4.2

Reference number attributed to the notice by the contracting authority

NGarrDdu-Rramp-0001

4.3

Time Limits

Time-limit for receipt of completed tenders
    26-07-2024  Time  16:00

Estimated award date
 29-07-2024

4.5

Language or languages in which tenders or requests to participate can be drawn up

EN 

4.6

Tender Submission Postbox

5 Other Information

5.1

Additional Information

This notice has been sent as a region specific notice. If you did not receive an alert about this you are not based in the specific region selected by the buying authority. Questions on why this was sent as a region specific notice should be sent to the buying authority.

(WA Ref:142951)

5.2

Additional Documentation

SAF4-NGarrDdu-Rramp-0001 Tender .docx (4)

5.3

Publication date of this notice

 11-07-2024

Coding

Commodity categories

ID Title Parent category
90700000 Environmental services Sewage, refuse, cleaning and environmental services

Delivery locations

ID Description
1013 Conwy and Denbighshire

Alert region restrictions

The buyer has restricted the alert for this notice to suppliers based in the following regions.

ID Description
8 Powys
6 Gwynedd
5 Wrexham
4 Flintshire
3 Denbighshire
2 Conwy
1 Isle of Anglesey

About the buyer

Main contact:
N/a
Admin contact:
liam@northwalesriverstrust.org
Technical contact:
N/a
Other contact:
liam@northwalesriverstrust.org

Further information

Date Details
19/07/2024 10:24
ADDED FILE: SAF4-NGarrDdu-Rramp-0001 Tender Revised
Slightly updated document, please use this new version.

Additional Documents

The following additional documents have been attached to this notice. To obtain these documents please select the individual file names below.

Current documents

pdf
pdf11.27 MB
This file may not be accessible.
pdf
pdf11.20 MB
This file may not be accessible.

Replaced documents

There are no previous versions of these documents.


0800 222 9004

Lines are open 8:30am to 5pm Monday to Friday.

Rydym yn croesawu galwadau'n Gymraeg.

We welcome calls in Welsh.