Lot No: 1A
II.2.1) Title
Lot 1A Generalist Buildings & Civils
II.2.2) Additional CPV code(s)
45100000
45200000
45210000
45213320
45213321
45221112
45300000
71332000
II.2.3) Place of performance
NUTS code:
UK
Main site or place of performance:
Eastern Region including all routes and areas where work will be delivered by the region.
II.2.4) Description of the procurement
The scope of work type to be delivered includes but not limited to the
following:-
Building/civils and associated mechanical and electrical works for:
Buildings (Station & Lineside), Light Maintenance Depots, Maintenance
Delivery Units, Platform, Canopies, Train sheds, Footbridges, Car Parks and
roads and Asbestos contaminated buildings.
Mechanical & Electrical (M&E) for: Lifts and escalators, Cable route works,
Mechanical, Electrical, Depot plant, Lifts and Escalators and Cable route
works.
Structural works for: Underbridges, Preventative Tunnel interventions,
Culverts, Overbridges, Tunnel Repair, Retaining structures, Footbridges,
Equipment support structures (signal posts/OLE gantries) and Scour Works.
Geotechnical works for: Earthwork Embankment, Condition monitoring,
Earthwork Soil Cutting, Earthwork Rock Cuttings, Drainage and Off-Track.
II.2.11) Information about options
Options:
Yes
Description of options:
The initial term of the framework will be 5 years (plus a 2 month mobilisation period) with an option, to extend in yearly increments up to a further 5 years.
II.2.13) Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
No
II.2.14) Additional information
The lot value is for guidance only and is based on the projected spend for the 10-year framework duration with estimated uplifts
Lot No: 1B
II.2.1) Title
Lot 1B Specialist Structures
II.2.2) Additional CPV code(s)
45100000
45200000
45210000
45213320
45213321
45221112
45300000
II.2.3) Place of performance
NUTS code:
UK
Main site or place of performance:
Eastern Region including all routes and areas where work will be delivered by the region.
II.2.4) Description of the procurement
The scope of work type to be delivered is Primarily that of Structures and
associated works but may also include and not limited to the following:-
Building/civils and associated mechanical and electrical works for:
Buildings (Station & Lineside), Light Maintenance Depots, Maintenance
Delivery Units, Platform, Canopies, Train sheds, Footbridges, Car Parks and
roads and Asbestos contaminated buildings.
Mechanical & Electrical (M&E) for: Lifts and escalators, Cable route works,
Mechanical, Electrical, Depot plant, Lifts and Escalators and Cable route works.
Structural works for: Underbridges, Preventative Tunnel interventions,
Culverts, Overbridges, Tunnel Repair, Retaining structures, Footbridges,
Equipment support structures (signal posts/OLE gantries) and Scour Works.
Could include Geotechnic works for: Earthwork Embankment, Condition
monitoring, Earthwork Soil Cutting, Earthwork Rock Cuttings, Drainage and Off-Track.
II.2.11) Information about options
Options:
Yes
Description of options:
The initial term of the framework will be 5 years (plus a 2 month mobilisation period) with an option, to extend in yearly increments up to a further 5 years.
II.2.13) Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
No
II.2.14) Additional information
The lot value is for guidance only and is based on the projected spend for the 10-year framework duration with estimated uplifts.
Lot No: 1C
II.2.1) Title
Lot 1C Specialist Geotechnical
II.2.2) Additional CPV code(s)
45100000
45200000
45210000
45213320
45213321
45221112
45300000
71332000
II.2.3) Place of performance
NUTS code:
UK
Main site or place of performance:
Eastern Region including all routes and areas where work will be delivered by the region.
II.2.4) Description of the procurement
The scope of work type to be delivered is Primarily that of Geotechnical and
associated works but may also include and not limited to the following:-
Building/civils and associated mechanical and electrical works for:
Buildings (Station & Lineside), Light Maintenance Depots, Maintenance
Delivery Units, Platform, Canopies, Train sheds, Footbridges, Car Parks and
roads and Asbestos contaminated buildings.
Mechanical & Electrical (M&E) for: Lifts and escalators, Cable route works,
Mechanical, Electrical, Depot plant, Lifts and Escalators and Cable route works.
Optional Structural works for: Underbridges, Preventative Tunnel
interventions, Culverts, Overbridges, Tunnel Repair, Retaining structures,
Footbridges, Equipment support structures (signal posts/OLE gantries) and
Scour Works.
Geotechnic works for: Earthwork Embankment, Condition monitoring,
Earthwork Soil Cutting, Earthwork Rock Cuttings, Drainage and Off-Track.
II.2.11) Information about options
Options:
Yes
Description of options:
The initial term of the framework will be 5 years (plus a 2 month mobilisation period) with an option, to extend in yearly increments up to a further 5 years.
II.2.13) Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
No
II.2.14) Additional information
The lot value is for guidance only and is based on the projected spend for the 10-year framework duration with estimated uplifts.
Lot No: 2A
II.2.1) Title
Lot 2A Generalist Signalling and Telecoms
II.2.2) Additional CPV code(s)
45234000
45234115
45234116
71311230
II.2.3) Place of performance
NUTS code:
UK
Main site or place of performance:
Eastern Region including all routes and areas where work will be delivered by the region.
II.2.4) Description of the procurement
The scope of work type to be delivered includes but not limited
to the following:-
Interlocking & NX panels works for:
Re-wire/Life extend.
Route Relay Interlocking alterations to account for any new
trackside works.
Alterations to existing Solid State Interlockings (SSI) to account
for any new trackside works.
Entrance Exit (NX) panel updates.
Level Crossing Predictor/Controller works for:
Level crossing Life Extension Works (LEW) for all types of
crossings.
Level crossings renewals for all types of level crossings.
Conversion of mechanical winding barriers.
Transmission / Network works for:
Intelligent infrastructure installations.
TDM renewals.
Provision of FTNX / FTNX points of presence in signaling
equipment rooms (inc. REBs).
Remove of obsolete equipment - transmission (CCTV, TDM & FDM).
Track/Way Side (Equipment Housing, Power, Terminals, Signals,
Points, Train Detection) works for:
Life Extension works. Including signal conversion, location case renewal and re-wire.
Intelligent infrastructure installations.
Alterations to signaling power supplies.
Track circuit conversions.
Ground frame conversion to Ground Switch Panel (GSP)
Provision of staff protection systems.
Targeting component renewals - HABDs / REBs / LOCs.
Cable route works including multi core cable renewals.
AWS, TPWS renewal.
Signaling Bonding works.
II.2.11) Information about options
Options:
Yes
Description of options:
The initial term of the framework will be 5 years (plus a 2 month mobilisation period) with an option, to extend in yearly increments up to a further 5 years.
II.2.13) Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
No
II.2.14) Additional information
The lot value is for guidance only and is based on the projected spend for the 10-year framework duration with estimated uplifts
Lot No: 2B
II.2.1) Title
Lot 2B Specialist Signaling
II.2.2) Additional CPV code(s)
45232332
45234000
45234115
45234116
45314000
71311230
II.2.3) Place of performance
NUTS code:
UK
Main site or place of performance:
Eastern Region including all routes and areas where work will be delivered by the region.
II.2.4) Description of the procurement
The scope of work type to be delivered is Primarily that of
Signaling and associated works but may also include and not
limited to the following:-
Interlocking & NX panels works for:
Re-wire/Life extend.
Route Relay Interlocking alterations to account for any new trackside works.
Alterations to existing Solid State Interlockings (SSI) to account for any new trackside works.
Entrance Exit (NX) panel updates.
Level Crossing Predictor/Controller works for:
Level crossing Life Extension Works (LEW) for all types of crossings.
Level crossings renewals for all types of level crossings.
Conversion of mechanical winding barriers.
Transmission / Network works for:
Intelligent infrastructure installations.
TDM renewals.
Provision of FTNX / FTNX points of presence in signaling
equipment rooms (inc. REBs).
Remove of obsolete equipment - transmission (CCTV, TDM & FDM).
Track/Way Side (Equipment Housing, Power, Terminals, Signals,
Points, Train Detection) works for:
Life Extension works. Including signal conversion, location case renewal and re-wire.
Intelligent infrastructure installations.
Alterations to signaling power supplies.
Track circuit conversions.
Ground frame conversion to Ground Switch Panel (GSP)
Provision of staff protection systems.
Targeting component renewals - HABDs / REBs / LOCs.
Cable route works including multi core cable renewals.
AWS, TPWS renewal.
Signaling Bonding works.
II.2.11) Information about options
Options:
Yes
Description of options:
The initial term of the framework will be 5 years (plus a 2 month mobilisation period) with an option, to extend in yearly increments up to a further 5 years.
II.2.13) Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
No
II.2.14) Additional information
The lot value is for guidance only and is based on the projected spend for the 10-year framework duration with estimated uplifts.
Lot No: 2C
II.2.1) Title
Lot 2C Specialist Telecoms
II.2.2) Additional CPV code(s)
45232332
45234000
45234115
45234116
45314000
71311230
II.2.3) Place of performance
NUTS code:
UK
Main site or place of performance:
Eastern Region including all routes and areas where work will be delivered by the region.
II.2.4) Description of the procurement
The scope of work type to be delivered is Primarily that of
Telecommunications and associated works but may also include and not limited to the following:-
Interlocking & NX panels works for:
Re-wire/Life extend.
Route Relay Interlocking alterations to account for any new trackside works.
Alterations to existing Solid State Interlockings (SSI) to account for any new trackside works.
Entrance Exit (NX) panel updates.
Level Crossing Predictor/Controller works for:
Level crossing Life Extension Works (LEW) for all types of crossings.
Level crossings renewals for all types of level crossings.
Conversion of mechanical winding barriers.
Transmission / Network works for:
Intelligent infrastructure installations.
TDM renewals.
Provision of FTNX / FTNX points of presence in signaling
equipment rooms (inc. REBs).
Remove of obsolete equipment - transmission (CCTV, TDM & FDM).
Track/Way Side (Equipment Housing, Power, Terminals, Signals,
Points, Train Detection) works for:
Life Extension works. Including signal conversion, location case
renewal and re-wire.
Intelligent infrastructure installations.
Alterations to signalling power supplies.
Track circuit conversions.
Ground frame conversion to Ground Switch Panel (GSP)
Provision of staff protection systems.
Targeting component renewals - HABDs / REBs / LOCs.
Cable route works including multi core cable renewals.
AWS, TPWS renewal.
Signaling Bonding works.
II.2.11) Information about options
Options:
Yes
Description of options:
The initial term of the framework will be 5 years (plus a 2 month mobilisation period) with an option, to extend in yearly increments up to a further 5 years.
II.2.13) Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
No
II.2.14) Additional information
The lot value is for guidance only and is based on the projected spend for the 10-year framework duration with estimated uplifts.
Lot No: 3A
II.2.1) Title
Lot 3A Generalist Contact Systems
II.2.2) Additional CPV code(s)
45232210
45234000
71311230
II.2.3) Place of performance
NUTS code:
UK
Main site or place of performance:
Eastern Region including all routes and areas where work will be delivered by the region.
II.2.4) Description of the procurement
The scope of work type to be delivered includes but not limited
to the following:-
AC/DC contact systems works for:
Structure renewal & refurbishment.
Geotechnical assessment.
Overhead Line Equipment (OLE) campaign changes (rectification
of known issues).
OLE re-wire.
Crossover/Section insulator replacement (including potential
re-design if required).
Section insulator replacement.
Mid-life refurbishment.
Neutral section replacement (including carrier wire style neutral section design & installation).
Solid conductor beam refurbishment (& bonding).
OLE switch replacement.
Ancillary conductor re-wire.
Other Items included in the Scope:
Forensic analysis (root cause analysis of failures).
Isolation instructions and/or isolation diagram corrections,
correlation and reviews .
Legacy equipment renewal (design knowledge required) this
includes Mechanically Independent Registration and any
conversion of headspans.
Survey e.g. drone, point cloud, etc. for structures.
Tunnel renewals (fixed overhead line equipment, steelwork).
Mitigations at reduced clearance locations (flashover mitigations).
Traction bonding renewal.
II.2.11) Information about options
Options:
Yes
Description of options:
The initial term of the framework will be 5 years (plus a 2 month mobilisation period) with an option, to extend in yearly increments up to a further 5 years.
II.2.13) Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
No
II.2.14) Additional information
The lot value is for guidance only and is based on the projected spend for the 10-year framework duration with estimated uplifts.
Lot No: 3B
II.2.1) Title
Lot 3B Specialist Contact Systems
II.2.2) Additional CPV code(s)
45232210
45234000
71311230
II.2.3) Place of performance
NUTS code:
UK
Main site or place of performance:
Eastern Region including all routes and areas where work will be delivered by the region.
II.2.4) Description of the procurement
The scope of work type to be delivered includes but not limited
to the following:-
AC/DC contact systems works for:
Structure renewal & refurbishment.
Geotechnical assessment.
Overhead Line Equipment (OLE) campaign changes (rectification of known issues).
OLE re-wire.
Crossover/Section insulator replacement (including potential re-design if required).
Section insulator replacement.
Mid-life refurbishment.
Neutral section replacement (including carrier wire style neutral section design & installation).
Solid conductor beam refurbishment (& bonding).
OLE switch replacement.
Ancillary conductor re-wire.
Other Items included in the Scope:
Forensic analysis (root cause analysis of failures).
Isolation instructions and/or isolation diagram corrections, correlation and reviews .
Legacy equipment renewal (design knowledge required) this includes Mechanically Independent Registration and any conversion of headspans.
Survey e.g. drone, point cloud, etc. for structures.
Tunnel renewals (fixed overhead line equipment, steelwork).
Mitigations at reduced clearance locations (flashover mitigations).
Traction bonding renewal.
II.2.11) Information about options
Options:
Yes
Description of options:
The initial term of the framework will be 5 years (plus a 2 month mobilisation period) with an option, to extend in yearly increments up to a further 5 years.
II.2.13) Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
No
II.2.14) Additional information
The lot value is for guidance only and is based on the projected spend for the 10-year framework duration with estimated uplifts.
Lot No: 4A
II.2.1) Title
Lot 4A Generalist Distribution & Plant
II.2.2) Additional CPV code(s)
45234000
45315400
45315600
45317300
71311230
II.2.3) Place of performance
NUTS code:
UK
Main site or place of performance:
Eastern Region including all routes and areas where work will be delivered by the region.
II.2.4) Description of the procurement
The scope of work type to be delivered includes but not limited
to the following:-
HV traction distribution works for:
HV Substation Renewal/Refurbishment.
SCADA modifications inc control room updates.
OLE power connections (switch relocation / redesign).
Traction derived signalling power supplies.
Signalling power works for replacement of signalling power
supply equipment
Lighting and associated LV distribution works for:
Walkway lighting and columns.
Operational lighting (buffer stops etc.).
Rail yard lighting and columns.
Tunnel lighting.
Level crossing CCTV and lighting.
Other works:
Lineside operational equipment and monitoring
(Wheelchex/Panchex, etc).
Drainage pumps and associated equipment.
Low voltage and control equipment.
Points heating.
Control Centre power resilience.
Swing bridge controls replacement.
II.2.11) Information about options
Options:
Yes
Description of options:
The initial term of the framework will be 5 years (plus a 2 month mobilisation period) with an option, to extend in yearly increments up to a further 5 years.
II.2.13) Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
No
II.2.14) Additional information
The lot value is for guidance only and is based on the projected spend for the 10-year framework duration with estimated uplifts.
Lot No: 4B
II.2.1) Title
Lot 4B Specialist Distribution & Plant
II.2.2) Additional CPV code(s)
45234000
45315400
45315600
45317300
71311230
II.2.3) Place of performance
NUTS code:
UK
Main site or place of performance:
Eastern Region including all routes and areas where work will be delivered by the region.
II.2.4) Description of the procurement
The scope of work type to be delivered includes but not limited
to the following:-
HV traction distribution works for:
HV Substation Renewal/Refurbishment.
SCADA modifications inc control room updates.
OLE power connections (switch relocation / redesign).
Traction derived signalling power supplies.
Signalling power works for replacement of signalling power
supply equipment
Lighting and associated LV distribution works for:
Walkway lighting and columns.
Operational lighting (buffer stops etc.).
Rail yard lighting and columns.
Tunnel lighting.
Level crossing CCTV and lighting.
Other works:
Lineside operational equipment and monitoring
(Wheelchex/Panchex, etc).
Drainage pumps and associated equipment.
Low voltage and control equipment.
Points heating.
Control Centre power resilience.
Swing bridge controls replacement.
II.2.11) Information about options
Options:
Yes
Description of options:
The initial term of the framework will be 5 years (plus a 2 month mobilisation period) with an option, to extend in yearly increments up to a further 5 years.
II.2.13) Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
No
II.2.14) Additional information
The lot value is for guidance only and is based on the projected spend for the 10-year framework duration with estimated uplifts.
The contract has been awarded to a group of economic operators:
No
The contract has been awarded to a group of economic operators:
No
The contract has been awarded to a group of economic operators:
No
The contract has been awarded to a group of economic operators:
No
The contract has been awarded to a group of economic operators:
No
The contract has been awarded to a group of economic operators:
No
The contract has been awarded to a group of economic operators:
No
The contract has been awarded to a group of economic operators:
No
The contract has been awarded to a group of economic operators:
No
The contract has been awarded to a group of economic operators:
No
The contract has been awarded to a group of economic operators:
No
The contract has been awarded to a group of economic operators:
No
The contract has been awarded to a group of economic operators:
No
The contract has been awarded to a group of economic operators:
No
The contract has been awarded to a group of economic operators:
No
The contract has been awarded to a group of economic operators:
No
The ERP has been scoped to take into account the priorities of NR relating to economic, social and environmental well-being. These priorities are described in the procurement documents. Projects will be allocated annually. Projects will first be allocated to the Generalist of Specialist level. Projects will then be allocated between contractors (where there is more than one at that level) and will be based on ensuring an equitable allocation of relevant projects for the year between contractors. This will be based on the following 3 factors:
(a) Value in monetary terms based on the budget available for of Projects.
(b) Risk profile of Projects (as assessed by the Client and being the risk attendant to the relevant Generalist Contractor for each Project) such as stakeholder requirements, consents requirements, access and site conditions/ restrictions, programme restrictions, design complexity and external interfaces for example.
(c) Where applicable, Development Projects' Client Priority Levels.
The share of work which a contractor is entitled to can be reduced by up to 25% based on KPI performance.
Upfront Investment: The extended contract duration is required to provide sufficient time for suppliers to recoup the upfront investment expected to expedite the establishment of a fully functioning partnership delivery model.
Cultural/Organisational Alignment: Sophisticated alliance/partnership models require embedded cultural and people alignment that can only be achieved over a longer period through relationship management and coaching.
Programme Flexibility: Political and budgetary changes will require flexibility over the term to achieve programme outcomes. A 10 year term enables maximum flexibility to manage scheme and budget adjustments.
Working Practices: The new delivery model will represent a change in Network Rail working practices and procedures. An increased term will enable Network Rail to embed the necessary step change in maturity working in collaboration with the Partners to achieve the required outcomes.
Standardisation: A longer term contract is essential to realise primary benefit of design standardisation, requiring investment in time, resource and lessons learned.
Skills Shortage: Infrastructure spend in the UK is forecasted to increase in the next 10 years. In parallel the industry is seeing skills and resource shortages.