Summary
- OCID:
- ocds-kuma6s-103224
- Published by:
- Conwy County Borough Council
- Authority ID:
- AA0389
- Publication date:
- 15 February 2023
- Deadline date:
- -
- Notice type:
- Contract Award Notice
- Has documents:
- No
- Has SPD:
- No
- Has Carbon Reduction Plan:
- No
Abstract
The project involved constructing a granular type 1 footpath following an existing narrow public right of way sand footpath providing access from Trinity Crescent to West Shore beach. The works were to include but not limited to:
• Excavation of the existing footway material.
• Removal of surrounding vegetation.
• Removal of existing retaining wall section.
• Installation of edging kerbs, terram and granular type 1 sub base
• Stabilisation of surrounding dunes.
• New and existing sign erection/relocation.
• Transportation and deposition of excess beach material.
The footpath heads south from Trinity Crescent Road and finishes at West Shore beach. As the unsurfaced footway meanders south it runs between dunes, fencing and vegetation for approximately 900m. The path terminates at its junction with an existing path which runs parallel by the shoreline.
Full notice text
CONTRACT AWARD NOTICE – NATIONAL
|
WORKS |
1 Authority Details
|
1.1
|
Authority Name and Address
|
|
Conwy County Borough Council |
Bodlondeb, Bangor Road, |
Conwy |
LL32 8DU |
UK |
Iain Hayes |
+44 1492574000 |
|
|
http://www.conwy.gov.uk |
|
2 Contract Details
|
2.1
|
Title
Improvements to PRoW at West Shore, Llandudno
|
2.2
|
Description of the contract
The project involved constructing a granular type 1 footpath following an existing narrow public right of way sand footpath providing access from Trinity Crescent to West Shore beach. The works were to include but not limited to:
• Excavation of the existing footway material.
• Removal of surrounding vegetation.
• Removal of existing retaining wall section.
• Installation of edging kerbs, terram and granular type 1 sub base
• Stabilisation of surrounding dunes.
• New and existing sign erection/relocation.
• Transportation and deposition of excess beach material.
The footpath heads south from Trinity Crescent Road and finishes at West Shore beach. As the unsurfaced footway meanders south it runs between dunes, fencing and vegetation for approximately 900m. The path terminates at its junction with an existing path which runs parallel by the shoreline.
|
2.3
|
Notice Coding and Classification
|
|
|
|
|
45000000 |
|
Construction work |
|
45220000 |
|
Engineering works and construction works |
|
45233000 |
|
Construction, foundation and surface works for highways, roads |
|
45233100 |
|
Construction work for highways, roads |
|
45233130 |
|
Construction work for highways |
|
45233161 |
|
Footpath construction work |
|
45233226 |
|
Access road construction work |
|
45233260 |
|
Pedestrian ways construction work |
|
|
|
|
|
1013 |
|
Conwy and Denbighshire |
|
2.4
|
Estimated Total Value |
3 Procedure
|
3.1
|
Type of ProcedureSingle stage |
4 Award of Contract
|
4.1
|
Successful Bidders
|
4.1.1
|
Name and Address of successful supplier, contractor or service provider
Tom James Construction Services Ltd |
Broneirian, Tanygrisiau, |
Blaenau Ffestiniog |
LL413SL |
UK |
|
|
|
|
www.tjconstructionltd.cymru |
|
5 Other Information
|
5.1
|
Reference number attributed to the notice by the contracting authority
N/a
|
5.2
|
Date of Contract Award 11-09-2020 |
5.3
|
Number of tenders received
8
|
5.4
|
Other Information
(WA Ref:128536)
|
5.5
|
Additional DocumentationN/a |
5.6
|
Publication date of this notice: 15-02-2023 |
Coding
Commodity categories
ID |
Title
|
Parent category
|
45233226 |
Access road construction work |
Construction, foundation and surface works for highways, roads |
45000000 |
Construction work |
Construction and Real Estate |
45233130 |
Construction work for highways |
Construction, foundation and surface works for highways, roads |
45233100 |
Construction work for highways, roads |
Construction, foundation and surface works for highways, roads |
45233000 |
Construction, foundation and surface works for highways, roads |
Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork |
45220000 |
Engineering works and construction works |
Works for complete or part construction and civil engineering work |
45233161 |
Footpath construction work |
Construction, foundation and surface works for highways, roads |
45233260 |
Pedestrian ways construction work |
Construction, foundation and surface works for highways, roads |
Delivery locations
ID |
Description
|
1013 |
Conwy and Denbighshire |
Alert region restrictions
The buyer has restricted the alert for this notice to suppliers based in the following regions.
ID |
Description
|
There are no alert restrictions for this notice.
|
Document family
Notice details
|
- Publication date:
- 04 August 2020
- Deadline date:
- 27 August 2020 00:00
- Notice type:
- Contract Notice
- Authority name:
- Conwy County Borough Council
|
- Publication date:
- 15 February 2023
- Notice type:
- Contract Award Notice
- Authority name:
- Conwy County Borough Council
|
About the buyer
- Main contact:
- N/a
- Admin contact:
- N/a
- Technical contact:
- N/a
- Other contact:
- N/a
Further information
Date
|
Details
|
No further information has been uploaded.
|