Contract Notice

Tywi Gateway Project - Delivery Phase Design Services

  • First published: 31 January 2019
  • Last modified: 31 January 2019

Contents

Summary

OCID:
ocds-kuma6s-089305
Published by:
Tywi Gateway Trust
Authority ID:
AA73966
Publication date:
31 January 2019
Deadline date:
11 March 2019
Notice type:
Contract Notice
Has documents:
Yes
Has SPD:
No
Has Carbon Reduction Plan:
N/A

Abstract

The Tywi Gateway Trust wishes to appoint a design team which will include a conservation architect and landscape architect with other specialist consultant support, to guide us through the process of delivering the Heritage Lottery Funded Tywi Gateway Project at the Bishop’s Park, Old Bishop’s Palace, Abergwili, Carmarthenshire, SA31 2JG (NGR SN441209). This project will conserve, restore and rejuvenate the nationally important Bishop’s Park (a registered historic park and garden) and listed Old Bishop’s Palace outbuildings, working with the local community and project partners Carmarthenshire County Council and the Representative Body of the Church in Wales to create an education and interpretation centre and café, providing opportunities for sustainable income streams to support the long-term management and maintenance of the site. The site is located in the settlement of Abergwili, immediately to the east of Carmarthen, and lies directly to the south of the A40 trunk road. An initial Development Stage of the Tywi Gateway Project, supported by the Parks for People Heritage Lottery Fund scheme, was undertaken from 2014 to 2016 and took restoration designs through to RIBA Stage 3. Now, having secured further funding from the Heritage Lottery Fund, Carmarthenshire County Council and other funders for the Delivery Stage of the project, the Tywi Gateway Trust need a design team, led by an accredited conservation architect alongside a landscape architect, to work with the Trust and a team of specialists, including ecologist, archaeologist and interpretation specialist. We need you to ensure that we have detailed designs that will enable us to achieve these objectives, producing drawings and documents to RIBA stage 7. The project must be completed within the available resources, to a high quality and to a tight timescale so that the sustainability of the Bishop’s Park and Tywi Gateway Centre can be secured for the future.

Full notice text

CONTRACT NOTICE – NATIONAL

SERVICES

1 Authority Details

1.1

Authority Name and Address


Tywi Gateway Trust

The Old Bishop’s Palace, Abergwili,

Carmarthen

SA31 2JG

UK

Louise Austin

+44 7399265237

louiseaustin@tywigateway.org.uk

Tywigateway.org.uk
www.sell2wales.gov.wales

1.2

Address from which documentation may be obtained

As in 1.1

1.3

Completed documents must be returned to:

As in 1.1

2 Contract Details

2.1

Title

Tywi Gateway Project - Delivery Phase Design Services

2.2

Description of the goods or services required

The Tywi Gateway Trust wishes to appoint a design team which will include a conservation architect and landscape architect with other specialist consultant support, to guide us through the process of delivering the Heritage Lottery Funded Tywi Gateway Project at the Bishop’s Park, Old Bishop’s Palace, Abergwili, Carmarthenshire, SA31 2JG (NGR SN441209).

This project will conserve, restore and rejuvenate the nationally important Bishop’s Park (a registered historic park and garden) and listed Old Bishop’s Palace outbuildings, working with the local community and project partners Carmarthenshire County Council and the Representative Body of the Church in Wales to create an education and interpretation centre and café, providing opportunities for sustainable income streams to support the long-term management and maintenance of the site.

The site is located in the settlement of Abergwili, immediately to the east of Carmarthen, and lies directly to the south of the A40 trunk road.

An initial Development Stage of the Tywi Gateway Project, supported by the Parks for People Heritage Lottery Fund scheme, was undertaken from 2014 to 2016 and took restoration designs through to RIBA Stage 3. Now, having secured further funding from the Heritage Lottery Fund, Carmarthenshire County Council and other funders for the Delivery Stage of the project, the Tywi Gateway Trust need a design team, led by an accredited conservation architect alongside a landscape architect, to work with the Trust and a team of specialists, including ecologist, archaeologist and interpretation specialist.

We need you to ensure that we have detailed designs that will enable us to achieve these objectives, producing drawings and documents to RIBA stage 7. The project must be completed within the available resources, to a high quality and to a tight timescale so that the sustainability of the Bishop’s Park and Tywi Gateway Centre can be secured for the future.

NOTE: To register your interest in this notice and obtain any additional information please visit the Sell2Wales Web Site at https://www.sell2wales.gov.wales/Search/Search_Switch.aspx?ID=89305.

2.3

Notice Coding and Classification

71200000 Architectural and related services
71220000 Architectural design services
71400000 Urban planning and landscape architectural services
1014 South West Wales (Carmarthenshire, Pembrokeshire, Ceredigion)

2.4

Total quantity or scope of tender

Estimated total value of contract is a maximum of £125,000

3 Conditions for Participation

3.1

Minimum standards and qualification required

The Lead Consultant will be an Accredited Conservation Architect with relevant experience and expertise in relation to historic building restoration and adjoining new build design, in particular with comparable early-mid 19th century buildings and structures. The team will also include a landscape architect with relevant experience and expertise in relation to comparable historic parkland restoration of nationally important designed landscapes and in particular to early-mid 19th century parks and gardens.

Additional design team members are expected to include, but not be limited to, Mechanical and Electrical Engineer, Quantity Surveyor/Clerk of Works and Cost consultant. Input from a Catering consultant, Interpretation consultant, and Arboricultural consultant is also expected.

4 Administrative Information

4.1

Type of Procedure

Single stage

4.2

Reference number attributed to the notice by the contracting authority

N/a

4.3

Time Limits

Time-limit for receipt of completed tenders
    11-03-2019  Time  12:00

Estimated award date
 05-04-2019

4.5

Language or languages in which tenders or requests to participate can be drawn up

EN 

4.6

Tender Submission Postbox

5 Other Information

5.1

Additional Information

(WA Ref:89305)

Under the terms of this contract the successful supplier(s) will be required to deliver Community Benefits in support of the authority’s economic and social objectives. Accordingly, contract performance conditions may relate in particular to social and environmental considerations. The Community Benefits included in this contract are:

Tenderers are invited to identify how they will contribute to the broader community benefit which is being delivered through the Tywi Gateway Project. Such contributions could add to the educational, volunteering, training and interpretational opportunities on offer to visitors to the Bishop’s Park and Museum.

Relates to the following project/programme financed by EU Community Funds: Partially funded through the Welsh Government Rural Communities Rural Development Programme

The buyer considers that this contract is suitable for consortia bidding.

5.2

Additional Documentation

Tywi Gateway Project Delivery Stage - Design Team Brief 30-01-2019
CMP Aug 2016
CMP Images 2015
TGP Masterplan AH
A2051 - P - 100-109 - PLANS SEC ELES
Great Meadow
A2051 BCE V6 Buildings
A2051 BCE V6 Walls
Design & Access Statement text
Habitat Management Plan Towy Gateway June 2016
W-34226 - DECISION NOTICE
W-34227 - DECISION NOTICE

5.3

Publication date of this notice

 31-01-2019

Coding

Commodity categories

ID Title Parent category
71200000 Architectural and related services Architectural, construction, engineering and inspection services
71220000 Architectural design services Architectural and related services
71400000 Urban planning and landscape architectural services Architectural, construction, engineering and inspection services

Delivery locations

ID Description
1014 South West Wales (Carmarthenshire, Pembrokeshire, Ceredigion)

Alert region restrictions

The buyer has restricted the alert for this notice to suppliers based in the following regions.

ID Description
There are no alert restrictions for this notice.

Document family

Notice details
Publication date:
31 January 2019
Deadline date:
11 March 2019 00:00
Notice type:
Contract Notice
Authority name:
Tywi Gateway Trust
Publication date:
06 August 2019
Notice type:
Contract Award Notice
Authority name:
Tywi Gateway Trust

About the buyer

Main contact:
louiseaustin@tywigateway.org.uk
Admin contact:
N/a
Technical contact:
N/a
Other contact:
N/a

Further information

Date Details
18/02/2019 11:19
Professional Indemnity Insurance
Please note that there was an incorrect response to the last question posed regarding levels of Professional Indemnity insurance required.

Professional Indemnity Cover of £2 million will be acceptable.
27/02/2019 09:17
ADDED FILE: Activity Plan
Tywi Gateway Project Activity Plan 2016
27/02/2019 09:24
ADDED FILE: Draft Interpretation Plan
Tywi Gateway Project Draft Interpretation Plan 2016

Q&A

Ask the buyer any questions you may have relating to this notice. To ask the buyer a question or questions please click the "View Questions and Answers" button.

Additional Documents

The following additional documents have been attached to this notice. To obtain these documents please select the individual file names below.

Current documents

pdf
pdf741.21 KB
This file may not be accessible.
pdf
pdf1.69 MB
This file may not be accessible.
png
png917.32 KB
This file may not be accessible.
pdf
pdf15.87 MB
This file may not be accessible.
pdf
pdf8.59 MB
This file may not be accessible.
pdf
pdf6.09 MB
This file may not be accessible.
pdf
pdf101.13 KB
This file may not be accessible.
pdf
pdf79.91 KB
This file may not be accessible.
PDF
PDF152.04 KB
This file may not be accessible.
PDF
PDF147.45 KB
This file may not be accessible.
pdf
pdf690.37 KB
This file may not be accessible.
pdf
pdf10.63 MB
This file may not be accessible.
pdf
pdf8.28 MB
This file may not be accessible.
docx

Replaced documents

There are no previous versions of these documents.


0800 222 9004

Lines are open 8:30am to 5pm Monday to Friday.

Rydym yn croesawu galwadau'n Gymraeg.

We welcome calls in Welsh.