Description of the contract
The scope of the project in summary was:
- Completely take up and dispose of the existing flooring to the main hall.
- Excavate and replace any defective screed, apply new screed and apply self-levelling compound to existing floor.
- Provide new flooring. Poly floor or similar approved (Woodfix range or similar)
- Externally excavate existing slabs and set aside for reuse (approx.. 36sm)
- Excavate and install ACO drainage channels with safety gratings in accordance with tender drawings and connect to existing drainage system.
- Relay existing slabs to falls to facilitate adequate run off during wet weather.
- Hack off all defective render to front elevation, treat affected areas and apply new polymer render to match existing. (Approx. 15sm)
- Provide paint finish to front elevation of main hall and boiler room, to match the existing school colour. (approx..80sm)
This notice is to inform the market of the contract award
|