Contract Award Notice

NWRT - SWIMWAYS_P02, fencing, tree planting, gates, troughs, solar

  • First published: 15 March 2024
  • Last modified: 15 March 2024

The buyer is not using this website to administer the notice.

To record your interest or obtain additional information or documents please find instructions within the Full Notice Text. (NOTE: Contract Award Notices and Prior Information Notices do not normally require a response)

Contents

Summary

OCID:
ocds-kuma6s-139214
Published by:
North Wales River Trust
Authority ID:
AA83577
Publication date:
15 March 2024
Deadline date:
-
Notice type:
Contract Award Notice
Has documents:
No
Has SPD:
No
Has Carbon Reduction Plan:
No

Abstract

PLEASE SUBMIT QUOTES VIA EMAIL TO antony@northwalesriverstrust.org Stock fencing ~ 990 m. Fence to be constructed using FSC certified, UC4 treated timber and high tensile wire. Strainer posts to be 7-8” diameter and at start, end and major changes in direction, supported by braced struts. Turning posts 5-6” used at minor changes in direction or height. Intermediate posts 3-4” diameter and no more than 11’ apart. 80 cm sheep netting with two strands of barbed wire, one above and one below the netting. The finished fence height should be approximately 1.1m (44”). Use of a track machine is obligatory due to wet ground conditions likely to be encountered. Strainer posts and struts to be no closer than 2 m from the top of a steep bank, or if gentle sloped bank, no closer than 2 m to the water’s edge. The exact positioning of the fence will be agreed between the contractor, grazier, and NWRT before installation. - Remove ~ 280 m of existing fence and dispose off-site. - Supply and hang 4 x 12’ galvanised steel access gates at the locations indicated on the plans (excluding location at Photo 5, Figure 2). Gates should include self-closing springs with appropriate tie-back stakes/latches. Access gates should always be hung on gate posts which are railed to a strainer, never hung on the same post that wire is tensioned to. Livestock bridge (near Photo 2, Figure 2) - Erect post and rail fencing either side of the livestock bridge, ~ 40 m total length. Groundwork will be required to clear ~ 2.5 m of hedgerow and stone wall to allow stock access to the bridge. Vehicle bridge (Photo 3, Figure 2) - Erect post and rail fencing either side of the vehicle bridge (Photo), ~ 20 m total length. - Resurface bridge. The bridge is constructed from railway sleepers on metal girders. Please specify your approach to resurfacing the bridge in your quotation – site visit advised. Road access gate (Photo 5, Figure 2) - Supply and install 1 x 16’ galvanised steel access gate. The road access is currently not wide enough for large farm vehicles. To widen access a section of stone wall, ~4’, will need to be removed. Improving road access and resurfacing the bridge will prevent use of the ford which is to be fenced off. Water supply - Supply and Install 1 x SPS-70 solar pump system (https://solarpumpsolutions.co.uk/,secured to concrete base to prevent theft. The pump should be located no more than 30m distance and 5m elevation from the watercourse. The system should be South facing with a clear, unobstructed view. Post and rail fencing should surround the pump to prevent damage by livestock. Replace stock battery with NWRT Supplied battery (if required). Landowner/tenant to keep stock battery as spare. Also see attached SPS guidance sheets for installation and priming. - Piping – Dig trench to lay 540 m pipe. Where the pipe crosses pasture, the trench depth must exceed ploughing depth (minimum 30 cm depth). Pipe from watercourse abstraction point is to be one unbroken piece (no joints) of 25mm pipe, ~ 25 m. Piping from the water pump going to the troughs is to be 32mm ONLY with fast flow/low pressure ball valves on water troughs so water flow rate is not restricted. ANY joints fitted are to be suitable Plasson joints. - Install 1 x sump abstraction point for solar pump system following design principles set out in technical note TN665 produced by the Farm Advisory Service. https://www.fas.scot/downloads/alternative-watering-field-grazed-livestock-i-abstraction-systems/ and see Figure X (Water housing figure). Due to in-river planning restrictions the sump abstraction system cannot be installed before mid-April 2024. Before installation of the sump the abstraction pipe to the solar pump should be temporally secured within the river channel at a suitably deep location but not in contact with the riverbed. Water housing to be installed in river to allow water abstraction – 300mm perforated twin walled pipe to be dug into riverbed with 110mm

Full notice text

CONTRACT AWARD NOTICE – NATIONAL

SUPPLIES

1 Authority Details

1.1

Authority Name and Address


North Wales River Trust

Gwel Yr Afon, Llanddoged,,

Llanrwst

LL26 0TY

UK

Antony Smith

+44 7534019158

antony@northwalesriverstrust.org

http://www.northwalesriverstrust.org

2 Contract Details

2.1

Title

NWRT - SWIMWAYS_P02, fencing, tree planting, gates, troughs, solar

2.2

Description of the contract

PLEASE SUBMIT QUOTES VIA EMAIL TO antony@northwalesriverstrust.org

Stock fencing ~ 990 m.

Fence to be constructed using FSC certified, UC4 treated timber and high tensile wire. Strainer posts to be 7-8” diameter and at start, end and major changes in direction, supported by braced struts. Turning posts 5-6” used at minor changes in direction or height. Intermediate posts 3-4” diameter and no more than 11’ apart.

80 cm sheep netting with two strands of barbed wire, one above and one below the netting. The finished fence height should be approximately 1.1m (44”).

Use of a track machine is obligatory due to wet ground conditions likely to be encountered.

Strainer posts and struts to be no closer than 2 m from the top of a steep bank, or if gentle sloped bank, no closer than 2 m to the water’s edge. The exact positioning of the fence will be agreed between the contractor, grazier, and NWRT before installation.

- Remove ~ 280 m of existing fence and dispose off-site.

- Supply and hang 4 x 12’ galvanised steel access gates at the locations indicated on the plans (excluding location at Photo 5, Figure 2). Gates should include self-closing springs with appropriate tie-back stakes/latches. Access gates should always be hung on gate posts which are railed to a strainer, never hung on the same post that wire is tensioned to.

Livestock bridge (near Photo 2, Figure 2)

- Erect post and rail fencing either side of the livestock bridge, ~ 40 m total length. Groundwork will be required to clear ~ 2.5 m of hedgerow and stone wall to allow stock access to the bridge.

Vehicle bridge (Photo 3, Figure 2)

- Erect post and rail fencing either side of the vehicle bridge (Photo), ~ 20 m total length.

- Resurface bridge. The bridge is constructed from railway sleepers on metal girders. Please specify your approach to resurfacing the bridge in your quotation – site visit advised.

Road access gate (Photo 5, Figure 2)

- Supply and install 1 x 16’ galvanised steel access gate. The road access is currently not wide enough for large farm vehicles. To widen access a section of stone wall, ~4’, will need to be removed. Improving road access and resurfacing the bridge will prevent use of the ford which is to be fenced off.

Water supply

- Supply and Install 1 x SPS-70 solar pump system (https://solarpumpsolutions.co.uk/,secured to concrete base to prevent theft. The pump should be located no more than 30m distance and 5m elevation from the watercourse. The system should be South facing with a clear, unobstructed view. Post and rail fencing should surround the pump to prevent damage by livestock. Replace stock battery with NWRT Supplied battery (if required). Landowner/tenant to keep stock battery as spare. Also see attached SPS guidance sheets for installation and priming.

- Piping – Dig trench to lay 540 m pipe. Where the pipe crosses pasture, the trench depth must exceed ploughing depth (minimum 30 cm depth). Pipe from watercourse abstraction point is to be one unbroken piece (no joints) of 25mm pipe, ~ 25 m. Piping from the water pump going to the troughs is to be 32mm ONLY with fast flow/low pressure ball valves on water troughs so water flow rate is not restricted. ANY joints fitted are to be suitable Plasson joints.

- Install 1 x sump abstraction point for solar pump system following design principles set out in technical note TN665 produced by the Farm Advisory Service. https://www.fas.scot/downloads/alternative-watering-field-grazed-livestock-i-abstraction-systems/ and see Figure X (Water housing figure). Due to in-river planning restrictions the sump abstraction system cannot be installed before mid-April 2024. Before installation of the sump the abstraction pipe to the solar pump should be temporally secured within the river channel at a suitably deep location but not in contact with the riverbed. Water housing to be installed in river to allow water abstraction – 300mm perforated twin walled pipe to be dug into riverbed with 110mm drainage pipe connected protruding out of the bank- see water housing diagram above (Figure 3).

- Supply and Install 5 x 75 gallon concrete drinking troughs with hardcore standing area at locations shown in plan. Troughs should be of suitable height for both sheep and cattle.

Tree Planting

- A total of 825 trees to be planted using the notch planting method. Plastic guards and wooden/bamboo canes to be used for all saplings and planted a minimum of 2.5 m apart. As many trees as possible should be sourced of a local origin https://naturalresources.wales/media/3119/choosing-provenance-in-broadleaved-trees.pdf. Species adapted to wet ground should constitute ~ 50% of the mix. Species recommended for wet ground are:

• Common alder

• Downy birch

• Hornbeam

• Pedunculate oak

• Sessile oak

• Black poplar

• Crack willow

• White willow

• Grey willow

• Bay willow

The tree planting area is ~ 1.5 ha. Much of this is rush pasture (~0.975 ha), and here trees are to be planted in the riparian zone and sporadically on appropriate patches of less damp ground. The aim is to obtain a mosaic habitat of trees, rushes, and meadow.

Tree planting can only commence when stock have been excluded from the tree planting zones (i.e., after installation of the stock fence and water supply). NWRT will provide the detailed design for tree planting.

All measurements are indicative, and quoted totals will be taken as definitive. It is the contractor’s obligation to clarify measurements to their own satisfaction, as adjustment to totals after completion cannot be made. Any additional works must be approved, otherwise payment cannot be made. Any brash clearing, tree work or other ground works required to install the scheme should be determined by the contractor and included in the initial quote.

It is the responsibility of the project officer and contractor to ensure that contracted works are not started WITHOUT A PROJECT OFFICER PRESENT. A project officer must be present at the beginning to brief all parties on the project. Failure to do so will void any contracts (and H&S policies) and payment may not be made. A project officer will meet you on the day of the works at 8am to outline the details. Please let NWRT know the times and dates of all works a minimum of 72 hours before the proposed works commence. A project officer may also follow up intermittently to check on the progress of the project (the frequency of this is dependent upon the complexity of the project). No other work than what is explicitly stated here is to be carried out unless approved by NWRT project manager. It is also the responsibility of the contractor to provide proof that all plant used are fit for purpose, as well as all relevant certifications.

2.3

Notice Coding and Classification

45340000 Fencing, railing and safety equipment installation work
45342000 Erection of fencing
100 UK - All
1000 WALES
1010 West Wales and The Valleys
1011 Isle of Anglesey
1012 Gwynedd
1013 Conwy and Denbighshire
1014 South West Wales (Carmarthenshire, Pembrokeshire, Ceredigion)
1015 Central Valleys (Merthyr Tydfil, Rhondda Cynon Taf)
1016 Gwent Valleys (Torfaen, Blaenau Gwent, Caerphilly)
1017 Bridgend and Neath Port Talbot
1018 Swansea
1020 East Wales
1021 Monmouthshire and Newport
1022 Cardiff and Vale of Glamorgan
1023 Flintshire and Wrexham
1024 Powys

2.4

Estimated Total Value

33000 GBP

3 Procedure

3.1

Type of Procedure

Single stage

4 Award of Contract

4.1

Successful Bidders

4.1.1

Name and Address of successful supplier, contractor or service provider





Prime Rural

Bryn Bela, Rhoscolyn,

Holyhead

LL652RX

UK




5 Other Information

5.1

Reference number attributed to the notice by the contracting authority

SWIMWAYS_P02

5.2

Date of Contract Award

 06-03-2024

5.3

Number of tenders received

10

5.4

Other Information

completed by 29/03/24.

(WA Ref:139990)

5.5

Additional Documentation

N/a

5.6

Publication date of this notice:

 15-03-2024

Coding

Commodity categories

ID Title Parent category
45342000 Erection of fencing Fencing, railing and safety equipment installation work
45340000 Fencing, railing and safety equipment installation work Building installation work

Delivery locations

ID Description
1017 Bridgend and Neath Port Talbot
1022 Cardiff and Vale of Glamorgan
1015 Central Valleys (Merthyr Tydfil, Rhondda Cynon Taf)
1013 Conwy and Denbighshire
1020 East Wales
1023 Flintshire and Wrexham
1016 Gwent Valleys (Torfaen, Blaenau Gwent, Caerphilly)
1012 Gwynedd
1011 Isle of Anglesey
1021 Monmouthshire and Newport
1024 Powys
1014 South West Wales (Carmarthenshire, Pembrokeshire, Ceredigion)
1018 Swansea
100 UK - All
1000 WALES
1010 West Wales and The Valleys

Alert region restrictions

The buyer has restricted the alert for this notice to suppliers based in the following regions.

ID Description
There are no alert restrictions for this notice.

Document family

Notice details
Publication date:
20 February 2024
Deadline date:
27 February 2024 00:00
Notice type:
Contract Notice
Authority name:
North Wales River Trust
Publication date:
15 March 2024
Notice type:
Contract Award Notice
Authority name:
North Wales River Trust

About the buyer

Main contact:
antony@northwalesriverstrust.org
Admin contact:
N/a
Technical contact:
N/a
Other contact:
N/a

Further information

Date Details
No further information has been uploaded.

0800 222 9004

Lines are open 8:30am to 5pm Monday to Friday.

Rydym yn croesawu galwadau'n Gymraeg.

We welcome calls in Welsh.