Description of the goods or services required
The project involves constructing a granular type 1 footpath following an existing narrow public right of way sand footpath providing access from Trinity Crescent to West Shore beach. The works will include but not limited to:
• Excavation of the existing footway material.
• Removal of surrounding vegetation.
• Removal of existing retaining wall section.
• Installation of edging kerbs, terram and granular type 1 sub base
• Stabilisation of surrounding dunes.
• New and existing sign erection/relocation.
• Transportation and deposition of excess beach material.
The footpath heads south from Trinity Crescent Road and finishes at West Shore beach. As the unsurfaced footway meanders south it runs between dunes, fencing and vegetation for approximately 900m. The path terminates at its junction with an existing path which runs parallel by the shoreline.
NOTE: To register your interest in this notice and obtain any additional information please visit the Sell2Wales Web Site at https://www.sell2wales.gov.wales/Search/Search_Switch.aspx?ID=103224.
The buyer has indicated that it will accept electronic responses to this notice via the Postbox facility. A user guide is available at https://www.sell2wales.gov.wales/sitehelp/help_guides.aspx.
Suppliers are advised to allow adequate time for uploading documents and to dispatch the electronic response well in advance of the closing time to avoid any last minute problems.
|