CONTRACT NOTICE – NATIONAL
|
SERVICES |
1 Authority Details
|
1.1
|
Authority Name and Address
|
|
Coleg Gwent |
Headquarters, The Rhadyr, |
Usk |
NP15 1XJ |
UK |
Procurement |
+44 1495333550 |
|
|
http://www.coleggwent.ac.uk https://etenderwales.bravosolution.co.uk/home.html https://etenderwales.bravosolution.co.uk/home.html |
|
1.2
|
Address from which documentation may be obtained
Coleg Gwent |
Headquarters, The Rhadyr, |
Usk |
NP15 1XJ |
UK |
Procurement |
+44 1495333550 |
|
|
http://www.coleggwent.ac.uk |
|
1.3
|
Completed documents must be returned to:
Coleg Gwent |
Headquarters, The Rhadyr, |
Usk |
NP15 1XJ |
UK |
Procurement |
+44 1495333550 |
|
|
http://www.coleggwent.ac.uk |
|
2 Contract Details
|
2.1
|
Title
215 - Newport Campus - Electrical Fixed Wire Testing contract
|
2.2
|
Description of the goods or services required
The purpose of this Electrical condition survey is to confirm, so far as reasonably practical, whether or not the electrical installation is in a satisfactory condition for continued service. The report should identify any damage, deterioration, defect and/or any conditions that may give rise to danger
The successful contractor shall carry out an Electrical Installation Condition Survey (periodic testing and inspection) in accordance with the BS 7671:2018 and the inspection and testing guidance note 3.
All circuits (100%), from all Section boards, Panel boards and distribution boards, must be electrically tested, and recorded on the electrical Installation condition report.
The electrical contractor shall also carry out a thorough visual inspection including a check on the condition of all the electrical equipment and material with regard to:
• Safety
• Wear and tear
• Corrosion
• Damage
• Excessive loading
• Age
• External influences
• Suitability
at our Newport Campus
NOTE: The authority is using eTenderwales to carry out this procurement process. To obtain further information record your interest on Sell2Wales at https://www.sell2wales.gov.wales/search/search_switch.aspx?ID=139869
|
2.3
|
Notice Coding and Classification
|
|
|
|
|
31300000 |
|
Insulated wire and cable |
|
38341300 |
|
Instruments for measuring electrical quantities |
|
38500000 |
|
Checking and testing apparatus |
|
45311000 |
|
Electrical wiring and fitting work |
|
45311100 |
|
Electrical wiring work |
|
45317000 |
|
Other electrical installation work |
|
71314100 |
|
Electrical services |
|
71630000 |
|
Technical inspection and testing services |
|
71632000 |
|
Technical testing services |
|
|
|
|
|
1021 |
|
Monmouthshire and Newport |
|
2.4
|
Total quantity or scope of tender
The purpose of this Electrical condition survey is to confirm, so far as reasonably practical, whether or not the electrical installation is in a satisfactory condition for continued service. The report should identify any damage, deterioration, defect and/or any conditions that may give rise to danger
The successful contractor shall carry out an Electrical Installation Condition Survey (periodic testing and inspection) in accordance with the BS 7671:2018 and the inspection and testing guidance note 3.
All circuits (100%), from all Section boards, Panel boards and distribution boards, must be electrically tested, and recorded on the electrical Installation condition report.
The electrical contractor shall also carry out a thorough visual inspection including a check on the condition of all the electrical equipment and material with regard to:
• Safety
• Wear and tear
• Corrosion
• Damage
• Excessive loading
• Age
• External influences
• Suitability
at our Newport Campus
|
3 Conditions for Participation
|
3.1
|
Minimum standards and qualification required
|
4 Administrative Information
|
4.1
|
Type of Procedure
Single stage
|
4.2
|
Reference number attributed to the notice by the contracting authority
215
|
4.3
|
Time LimitsTime-limit for receipt of completed tenders
26-04-2024
Time 12:00
Estimated award date 06-05-2024 |
4.5
|
Language or languages in which tenders or requests to participate can be drawn upEN
|
4.6
|
Tender Submission Postbox
|
5 Other Information
|
5.1
|
Additional Information
(WA Ref:139869)
|
5.2
|
Additional Documentation
|
5.3
|
Publication date of this notice 12-03-2024 |