Description of the contract
The Port of Milford Haven is seeking to appoint a competent Contractor to design and install new pontoons adjacent to the J-Wall.
The Scope includes the design, fabrication, installation and commissioning of a long linkspan pontoon and two adjoining pontoon spurs, including the mooring systems, fixings and access ladders.
The project will be undertaken under the NEC3 suite of contracts. The NEC3 Engineering and Construction Contract (ECC) 2013 Option A (with amendments) will apply to the commission.
Milford Haven Port Authority (MHPA) have identified the need for a series of finger pontoons at J Wall to provide additional space to berth small fishing vessels. At present, vessels berth alongside the quay which is an inefficient use of the space and leads to crowding along the quay wall. In addition, the mooring bollards located along the quay wall are in poor condition and have an unknown safe working
capacity and so are in need of replacement.
The project is intended to be funded by a Grant for UK Seafood Fund: Infrastructure (Round 2) and will only proceed on successful receipt of funding.
The Port of Milford Haven invites you to submit a proposal for the following works:
• Design and Build for Pontoons, guides, ladders and fixings and associated works
Full details of the works can be found in the full suite of documents via the SharePoint link below:
https://mhpa.sharepoint.com/:f:/s/O365Tenders/EstWKLTko3BKu-DwduY1UwABd4P8TeC2gE84PAX383TKwg?e=14CNMY
|